VIEW DETAILS
Show location in Google Maps
TECHNICAL
- Intervention level:
Scheme Design, Detail Design and Site Supervision.
- Client:
Department of Education, Government of Catalonia.
- Location:
Barcelona
- Project Year:
2007
- Construction Period:
04’ 2010 – 06’ 2012.
- Total built:
4.765’87 m2
- Budget:
5.094.151’82 €
- Construction company:
CRC
- Other technical:
- URBE, Technical architects & Structure Consultancy.
- Manuel Comas, engineer, Installations Consultancy.
- Pedro Pegenaute, Photography.
DESCRIPTION
Perform two types of intervention in this set. On one side reform and update of a functional and technical -structure, facilities, furniture, etc., the current building to meet all the requirements of the functional plan of the Department of Education. Furthermore, since this program requires a total built up, for IES 3/2, we need a new building expansion. The location of this extension is done as part of ongoing organizational spaces from the existing building and classrooms. The operation is completed with the construction of the new gym and changing rooms in a differential volume.